INDUSTRIAL PROJECTS

Steel Structures is part of the innovative industrial transformation 

 

Previous slide
Next slide

2020

Cow Farm, Psevdas

Farms for animal husbandry are usually constructed in portal frames such as this project. 

2020

IPH FOODSTORE, DALI NICOSIA

IPH Foodstore is a new warehouse located in Dali Industrial Zone, Nicosia. 

Previous slide
Next slide

2020

UREA BUILDING

2019

FROU FROU WAREHOUSE, NICOSIA

 

Frou Frou Warehouse is located in Nicosia. 

Previous slide
Next slide
Previous slide
Next slide

2019

MAVROVASILOS WAREHOUSE

2019

BLUE PHARMACY, LIMASSOL


Blue Pharmacy has been recentrly constructed in Limassol and is located in Limassol. It is a warehouse, a portal frame building.

Previous slide
Next slide
Previous slide
Next slide

2018

LIDL WAREHOUSE, LARNACA

Lidl, the German International Supermarket Chain which has been in Cyprus for over 10 years have recently expanded its facilities by the construction of an extension warehouse in their building in Aradippou Industrial zone in Larnaca. The building is estimated to be 1700 tonnes and the erection of it was done in the remarkable time of just 3 months.

2017

SILO, VASILIKO

A second Silo was constructed in 2017 of 700 tonnes.

Previous slide
Next slide

2016

OEDA, PENTAKOMO

OEDA in Pentakomo is a building for processing recycling material.

2016

sun tower, limassol

 

Sun Tower in Limassol is a DIY shop next to the the exit from the high way of Limassol to Nicosia.

Previous slide
Next slide

2013

VASILIKOS POWER PLANT RESTORATION, MARI

 

Following an unfortunate massive explosion in the Evangelos Florakis Navy Base on the 11th July 2011, the neighboring Power Station in Vassiliko which is the largest power facility in Cyprus and a major asset for the government, was severely damaged, causing widespread power cuts. Not long after this big shock that struck the Island, the Electricity Authority of Cyprus hired well respected companies to restore the base in really short time. Our company was awarded with the restoration of several crucial buildings in the station.

We have restored many of the severely damaged buildings in the station, amongst others the Administration Building, the Water Treatment Building, the Water Pump House and the Turbine Houses 1, 2 & 3.

The delivery time of the restored buildings was critical since the whole Island was suffering from the power shortages. Our company is proud that played an important role in restoring the power station and contributed in the comfort of the suffering citizens.

2011

LEROY MERLIN

 

Leroy Merlin is a French DIY shop which expanded in Cyprus by opening a shop in 2011. The building is located in Latsia Nicosia and has a tonnage of 1500 tonnes of steel.

2011

christofi bros warehouse, tseri nicosia

 

Christofi Bros Trading Ltd was established in 1997 with the purpose of discovering and simultaneously offering a quality choice to interior construction such as false ceilings, partitions, and floors as well as being thermally insulated.

In 2011, they moved into this new steel structure warehouse in Tseri.

2011

NEW YORK SWEETS PRODUCTION FACILITY, LIMASSOL

 

New York Sweets Production Facility was constructed in 2011 in Limassol.

New York Sweets is a confectionery and sweet company with a network of several stores across Cyprus. The company needed a new production facility. This became true in 2012.

2011

Electrical authority of cyprus, Head offices, nicosia


Head Offices of Electrical Authority of Cyprus in Nicosia.

2011

Electrical authority of cyprus stores, polis chrysochous, pafos

 

The Authority expanded, building a new storage area in Polis Chrysochou.

 
Previous slide
Next slide

2010

Cyprometal ltd second factory, Ayia Varvara

 

Our company’s Cyprometal Ltd second factory in Ayia Varvara

 

2007

SILO, VASILIKO

The Silo for the production of Cement in Vasilikos.

 
Previous slide
Next slide